PLE forum

Full Version: To add print date in the MultiGraph output
You're currently viewing a stripped down version of our content. View the full version with proper formatting.
Is it possible to add the print date after the license number in a Multigraph output. One can then check if the graph is actual or not.

Thanks.
That might be a possibility, all graphs (single graph, polar graph and multi-graph) currently do not show the printing date.
With tables, a date is shown, however, this is not the printing date but the date the table was successfully tested.

I assigned ticket no. J-716 to this request.