Specification of neutral or real top soil load (overburden) along pipeline axis (Input Table)
Data description/conditions:
X-P:
X-coordinate of data reference point
None / Required
(Column may be toggled to AX-L, AX-LP, NODE, ELEM or IDENT, see toggling data tables.)
NB1:
Neutral or real top soil load on pipeline just before and at X-P reference point
≥ 0.
(The value given for NB1 on the first data line is valid for every value of X less than or equal to X-P(1))
UNCF1:
Uncertainty factor for soil parameter NB1
≥ 1. / Undefined if NB1=0.
[Default: 1.1]
(The use of UNCF1 is according to U-RVT, specified in table UNCER.)
LOADF1:
Load factor for soil parameter NB1
> 0. / Undefined
[Default: 1.0]
(If specified, NB1 is multiplied by LOADF1.)
NB2:
Neutral or real top soil load on pipeline just after X-P reference point
≥ 0. / Undefined
(The value given for NB2 on the last data line is valid for every value of X greater than X-P(n). If NB2=UNDEFINED it is assumed NB2=NB1)
UNCF2:
Uncertainty factor for soil parameter NB2
≥ 1. / Undefined
(If UNCF2=UNDEFINED it is assumed that UNCF2=UNCF1. The use of UNCF2 is according to U-RVT, specified in table UNCER.)
LOADF2:
Load factor for soil parameter NB2
> 0. / Undefined
(If specified, NB2 is multiplied by LOADF2. If LOADF2=UNDEFINED it is assumed that LOADF2=LOADF1.)
(NB values including uncertainty factor shall not be greater than the related RVT values. In case there is no soil NB shall be 0.)
H610111, last changed: 9/14/2016
See also: